Frog and his son DJ, with help from other contractors, have made great progress on the front rooms remodel. They have removed all the lathe and plaster from walls and ceilings, removed the center wall (while bracing up the second floor), put in a lam beam to hold the weight, framed in the outer walls, replaced a window, added lots of good wood bracing and framing both to reinforce the weight of the second floor and to provide space for spray insulation, and have replaced/moved some ductwork. There's just a little bit more framing to do, I believe, then electrical, then insulation, then drywall.